Kitchen Progress 01/2026

  • Writer: Ruth M. Smith Center
    Ruth M. Smith Center
  • 7 days ago
  • 1 min read

The progress on the new kitchen has been moving swiftly. This month, the exterior frame, roof trusses, roof sheathing and shingle underlayment have been fully installed. The installation of soffit, facia, and drip edge is almost finished. Windows, and exterior doors have been delivered onsite with installation planning to be finalized this week. Once the bad weather subsides, the roof will be installed.


 
 
 